
Hosanna Christian - Klamath Falls, Oregon 2005
A complete gym floor installation consisting of a double layer plywood sub flooring system with rubber pads attached to the bottom side of the first layer of plywood. Maple flooring was nailed, sanded, sealed, painted, and finished using oil-modified urethanes.